DISCLAIMER:  These are my own notes learned from my own trials and tribulations of building things with concrete.  They are in no way, shape or form to be taken as an expert opinion.  Follow what you read here at your own risk.  This is mostly notes to myself as I work through learning how to build things out of concrete.

Big Lessons Learned

Helpers

Doing this by yourself is painful.  For anything more than a small job you absolutely need help.  Get as many people as you can to help you.

Make a Test Piece

Before pouring 10 bags of concrete in your project, mix a bag and make something that can use and get a feel for how to mix, pour, screed, trowel, finish and cure a piece of concrete.  In general the videos online and the directions on the bag that you will buy, highly simplify this process.  Moreover, the amount of water that the manufacturer suggested to mix with a bag of their concrete was not nearly enough to get it to the correct consistency.

It seems that there are a number of distinct steps when building things
out of concrete.  I will break them down as I see them and include
information about what I have learned.

Rent or Buy a Mixer If Using More Than Three or Four Bags

Not much more else to say about this . . . unless you want to get a very good workout.  On the plus side, I will say I feel like I learned what the proper consistency of the mix should be.

Tools and Equipment

  •  Heavy duty chemical resistant gauntlet gloved
  • Eye protection
  • Good dust mask
  • 2x4s
  • Darby: a 1×4 with a handle on it
  • Rake
  • Hoe
  • Shovel
  • Trowel
  • Float
  • Edger
  • Groover
  • Mixing bin and/or concrete mixer

Temperatures and Weather

50 degrees F or greater for at least a week.  Below 45 degrees the hydration process stops completely.  If it will go below that temperature have blankets handy to keep it warm.

No rain within the first 6 hours of pouring.

Buidling and Prepping the Forms

I built forms out of a combination of plywood, 2x4s and 2x6s.  In order to prevent the concrete from bonding to the surface of the wood I coated the wood with used motor oil and gear oil.  The gear oil was really old and I was going to recycle it anyway.  It was much thicker than used motor oil from one my cars.  When I ran out of the gear oil, I at first tried used oil from a car but instead used used Motul 300v out of my track bike.  The bike oil was more lightly used as I change it often.  It didn’t seem to make a difference in being able to remove it from the formed concrete.

I affixed the forms to the ground with a combination of 2x4s with sharpened ends that I pounded into the ground and cutting slots in the clay soil that the plywood fit into.

If I were building a very large slab I’d have to revisit the construction of the part of the forms that affixed them to the ground.

For the box that I build, the inside walls of the form were about 8 inches taller than the top of the concrete box.  This worked out really well because it made it much easier for me to just dump the concrete into the form.  Had the interior wall been flush with the top of where I wanted the wall to be I would have had to put it into the form a shovel at a time.

Mixing the Concrete

This seems to be probably the most difficult part of the job to get correct.  My first real project was a 45″x35″x16″ outer measurement drainage catch basin with 6″+ inch steel reinforced walls.

I should have either rented or purchased a concrete mixer, however it was a good lesson in actually lerning how to mix it correctly.

Because the structure that I was making was a concrete box with a pipe cast into it I ended up making in it two pours.  The first, the bottom of the box, and the second the walls of the box with the pip cast into it.

Given the readily availability of the product, I ended up using Sakrete Crack Resistant Concrete Mix.

I found a really good tutorial on how to actually mix the concrete with a rake that worked out well.  Towards the end of the process I used a hoe, however I believe that I ended up mixing it too dry.  The idea is to put all of the dry mix on one side of the mixing bin, then pour the water onto the other side.  Then a bit at a time, drag some of the dry concrete mix into the water and completely mix it before going back to the dry pile at the other end of the bin.  Continue until the whole bag is evenly mixed.

Based on my experience, use the directions on the bag as a starting point, as in my case, it was just plain wrong and not enough water.

To get the amount of water consistent, create a measuring bucket by measuring out the recommended amount of water into a bucket and marking a line on it.  Then, dump that water into another bucket and then fill up measuring bucket.

Then, when mixing your first couple use the following procedure to keep track of the total amount of water your need.

  1. Mix the initial amount of water into your mix from the second bucket
  2. If you need more water, measure it out before adding it to your mix and add the same amount of water to your mix AND the measuring bucket.
  3. Keep doing this until you reach the right consistency and then RE-MARK your line on your measuring bucket
Now you will have the correct amount of water that you can add to each batch that you mix.  This is much easier than spraying a bit at a time into your mix to get it correct and makes the entire pour more consistent.

This is a very good picture that illustrates what the mix should look like.  Instead of just linking the the page, I am including it here incase that site goes away.

“The mix is just right when the sides of the trough stand and the ingredients are thoroughly wetted. A hoe patted against the concrete will leave a slightly shiny surface.”

In my case, I made a big mistake and got freaked out about what I read about putting too much water in the concrete and focused too closely on the amount of water that the manufacturer suggested.  Which, by the way, was not nearly enough.

Between batches, have your helper rinse off your tools so that they don’t get caked with concrete.

Pouring the Concrete

Depending on the shape of your form, you can either dump the entire wheelbarrow or mixing basin into your form or shovel it into place.

After I did a layer of concrete around the whole of the box, I poked at the concrete with a thin stake (should have used a piece of rebar) to get it to settle and consolidate and then pounded on all sides of the form with a rubber mallet.

Unfortunately, I didn’t do this for all of the layers because I got freaked out that I was pouring it to wet as I saw water percolating to the top of the layer.  In retrospect, this is exactly what I should have been seeing.

I had a lip, under which I wanted to create a concrete ledge on the inside of the box.  Had my concrete been wetter and of a better consistency I could have worked it under the lip by simply jiggling the surface with my (gloved) hand or the face of the hoe.  Next time.

Screeding

Once the form is filled to the top, push or pull the appropriately sized 2×4 using a sawing motion as you move accross the surface using your form as a guide.

In this case, I wanted the bottom of the box to be at a slope but could not have forms in the bottom of the box.  I tied string to the vertical rebar to use as a guide and simply screeded the concrete uphill to make the slope that I wanted.

Darby or Bull Float

Immediately thereafter, sweep the darby across the concrete to help smooth the surface.  Do this in overlapping arcs with the leading edge of the 1×4 slightly raised.  Do two passes.

The screed and darby’s purpose is to help to force the aggregate down into the piece and leave the slurry of sand and cement to fill the surface and eventually provide a smooth, solid finish.

Do not over-work the concrete at this stage or it may pull too much sand and concrete to the surface and ultimately making the surface weaker than it should be.

Waiting for Bleed Water to Evaporate

At this point water will appear on the surface of the concrete.  It was during this phase when I did the first pour, the bottom of the box, that I got freaked out that I made the concrete mix too wet.  When, in reality, it was probably just right.  Water will come to the surface and actually sit on top of the concrete.

You will need to simply wait until it evaporates.   You will know when enough of it has evaporated when the sheen is gone from the surface, and the concrete starts to harden.

At this point you can move onto the finishing stage.

Finishing

Edging

Edging will remove sharp edged from where the concrete meets the form making it less likely for the edges to break off.

Grooving

Grooving helps guide where cracks may occur.

You can use a board layed across the form to guide straight lines.

Float

Trowling

Brooming

Pulling the Forms

The concrete that I used indicated about 24 hours before pulling the forms.

When I did, I realized that I had mixed my concrete a bit too dry.

More on how I attempted to address that later.

Curing

Based on my reading curing is both an art an a science and not at all simple.  It seems the most common method of curing concrete is “Wet Curing”; essentially hosing it down with water 5 – 10 times a day for the first week.  Covering it also helps keep the moisture in if you cannot be so attentive to your new concrete.  In that case, hose it down once a day, then cover it for the first week.

The curing process should be started once the concrete starts to harden, should not be allowed to dry fast and maintained at least the first 24 hours.

The science of it is based in the chemistry of how concrete hardens.  My basic understanding of it is that the curing (also referred to as hydration) of the concrete is the process by which the water blends with the aggregate, cement, and sand to form a crystalline lattice structure that provides the strength in the concrete.

Completely cured concrete takes up to about 30 days.

It seems that the key to curing concrete properly is controlling the moisture content of the concrete.  After it is hardened enough that the surface cannot be easily damaged 2 – 6 hours or so depending on the temperature and humidity, it should be gently hosed down to keep it wet.  You can also put a tarp, or plastic covering, or a layer of burlap soaked in water over it.  It seems the key is to not let the surface dry out such that the concrete can cure over time.

It seems it should be kept wet for at least 7 days

Drying

Painting, Staining, and Sealing

Wait at least 30 days until it is completely cured.